Skip to content
logo_color
  • Free FMEA Course
  • Services
Contact Us
Contact Us
logo_color

Introduction to FMEA

5
  • What is Risk in FMEA? Why Prevention Important?
  • Introduction to FMEA | Purpose & Key Benefits
  • History of FMEA – NASA to AIAG to AIAG-VDA
  • Types of FMEA – DFMEA, PFMEA, and FMEA-MSR
  • FMEA in APQP & IATF 16949 Context

Foundations of FMEA

7
  • Function Requirement Failure in FMEA
  • Severity in FMEA (AIAG-VDA) | Explained with Examples
  • Occurrence in FMEA (AIAG-VDA) | Explained with Examples
  • Detection in FMEA (AIAG-VDA) | Explained with Examples
  • RPN vs Action Priority (AP) – Why RPN is Outdated
  • FMEA Linkages – ISO 9001, IATF 16949, APQP, PPAP.
  • Why AIAG-VDA 7-Step Approach?

Step-1: Planning & Preparation in FMEA

4
  • Step 1 – Planning & Preparation in FMEA (AIAG-VDA Standard)
  • The Five Ts in FMEA – Intent, Timing, Team, Task, Tools
  • Defining Scope, Boundaries & Assumptions in FMEA
  • Cross-Functional Team Formation in FMEA

Step 2: Structure Analysis in FMEA

4
  • Step 2 – Structure Analysis in FMEA
  • System, Subsystem, and Component Breakdown in FMEA
  • Process Flow – Structure Tree & Block Diagram in FMEA
  • Motor Stator Winding – Structure Analysis in FMEA Example

Step 3: Function Analysis in FMEA

3
  • Step 3 – Function Analysis in FMEA
  • Defining Functions & Requirements in FMEA
  • How to Write Measurable Requirements in FMEA

Step 4: Failure Analysis in FMEA

6
  • Step 4 – Failure Analysis in FMEA (Failure Modes, Effects, Causes)
  • Function Net in FMEA | Chain of Functions
  • Failure at Mode Level – Failure Modes
  • Effects of Failure in FMEA
  • Causes of Failure in FMEA (Design vs Process)
  • Cascading Failures – Failure Cause Mode Effect Relationship in FMEA

Step 5: Risk Analysis in FMEA

9
  • Current Detection Controls in FMEA
  • Current Prevention Controls in FMEA (AIAG-VDA Standard)
  • Risk Evaluation in FMEA
  • Action Priority (AP) vs RPN in FMEA
  • Action Priority in FMEA (AIAG-VDA Standard)
  • Step 5 – Risk Analysis in FMEA
  • Severity in FMEA (AIAG-VDA) | Explained with Examples
  • Occurrence in FMEA (AIAG-VDA) | Explained with Examples
  • Detection in FMEA (AIAG-VDA) | Explained with Examples

Step 6: Optimization in FMEA

2
  • Tracking & Closing Actions in FMEA
  • Step 6 – Optimization in FMEA

Step 7: Results Documentation in FMEA

3
  • Customer Communication & Lessons Learned in FMEA
  • FMEA Report (Summary Table)
  • Step 7 – Results Documentation in FMEA

DFMEA in Practice

8
  • DFMEA in Practice – Step‑by‑Step
  • DFMEA Audit Readiness
  • DFMEA Optimization Step
  • DFMEA Risk Analysis
  • DFMEA Failure Analysis
  • DFMEA Function Analysis
  • DFMEA Structure Analysis
  • Product Snapshot – DFMEA in Practice (Step-by-Step)

PFMEA in Practice

10
  • PFMEA Audit Readiness
  • PFMEA Results Documentation
  • PFMEA Optimization step
  • PFMEA Risk Analysis
  • PFMEA Failure Analysis
  • PFMEA Function Analysis
  • PFMEA Structure Analysis
  • PFMEA Planning and Preparation
  • PFMEA Process Snapshot
  • PFMEA in Practice – Step‑by‑Step

FMEA Linkages

5
  • 📘 Case Study: How DFMEA Links to PFMEA and Control Plan — A Practical Guide
  • How FMEA Links to PPAP Deliverables
  • Prevention and Detection Controls in PFMEA to Control Plan | How to Link Them
  • How FMEA Drives Control Plans in Manufacturing Quality
  • FMEA and Control Plan Linkage

FMEA Tools & Templates

3
  • Excel vs Professional FMEA Software: Explain
  • FMEA in APIS IQ, PLATO SCIO, and Knowlence TDC: Overview of Top FMEA Software Tools
  • Excel-Based AIAG-VDA FMEA Template (Walkthrough)

FMEA Best Practices

2
  • FMEA Moderation: Common Mistakes & Best Practices
  • Common Mistakes & Best Practices in FMEA Creation

FMEA Advanced Applications

12
  • Future of FMEA – AI, Automation & Digital Technology
  • FMEA Use Cases in EVs, Welding, Electronics & Embedded Systems
  • Internal & Customer FMEA Audit Preparation
  • FMEA Moderation Techniques for Cross-Functional Teams
  • Advanced Failure Cause Modeling in FMEA
  • Family FMEA – Save Time Across Product Lines
  • FMEA in APQP Phases and Project Milestones
  • Using FMEA in Functional Safety (ISO 26262)
  • What is System FMEA? Scope, Structure & Interface Analysis
  • Which FMEA Software Should You Choose?
  • Software for FMEA
  • How FMEA Links with Control Plan, PPAP & Special Characteristics
View Categories
  • Home
  • FMEA Knowledge base
  • FMEA Linkages
  • FMEA and Control Plan Linkage

FMEA and Control Plan Linkage

FMEA Expert
Updated on September 7, 2025

4 min read

In the world of automotive and manufacturing quality, two documents stand out as the pillars of proactive risk management and process control: the Failure Modes and Effects Analysis (FMEA) and the Control Plan.

Understanding the linkage between FMEA and Control Plan is essential for ensuring that all identified risks are effectively controlled through documented and measurable control methods. This article explains how these two tools are connected, their significance in the product realization process, and how to effectively integrate them.


What is FMEA? #

FMEA (Failure Modes and Effects Analysis) is a structured methodology used to:

  • Identify potential failure modes in a product or process,
  • Analyze the causes and effects of those failures,
  • Assign risk ratings (Severity, Occurrence, Detection),
  • Propose recommended actions to reduce or eliminate risk.

In manufacturing, we often deal with Design FMEA (DFMEA) and Process FMEA (PFMEA), where PFMEA directly influences the Control Plan.


What is a Control Plan? #

A Control Plan is a detailed document that outlines the controls, monitoring methods, and reaction plans for key characteristics of a process or product.

It ensures that all process steps are carried out consistently and that critical risks identified in the PFMEA are effectively managed on the shop floor.

Control Plans typically include:

  • Product/process characteristics,
  • Specification and tolerances,
  • Control methods (e.g., SPC, Go/No-Go gages),
  • Sample size and frequency,
  • Reaction plan for nonconformities.

Why Is the Linkage Important? #

The FMEA and Control Plan linkage ensures a closed-loop system where identified risks from FMEA are translated into actionable controls.

Here’s why this linkage is crucial:

AspectFMEA RoleControl Plan Role
Risk IdentificationIdentifies potential failure modes and causesRefers to those risks when defining control methods
PreventionSuggests actions to eliminate or reduce risksImplements those actions as part of process control
MonitoringRates detection controls for failure modesSpecifies how detection is carried out in real-time
StandardizationPrioritizes issues that need attention (via AP or RPN)Standardizes control strategy to ensure consistency
Audit & ComplianceForms part of evidence for IATF 16949, ISO 9001, or customer auditsVerifies controls are active for critical and significant risks

How FMEA and Control Plan Are Linked (Step-by-Step) #

Let’s look at how to link FMEA and Control Plan effectively, using a step-by-step process aligned with the AIAG-VDA FMEA 7-Step Approach:

1. Use the Structure Tree (5M or Process Flow)

Both PFMEA and Control Plan start from the same process flow or structure tree. Ensure consistency between:

  • Process step number and name
  • Operation description
  • Product or process characteristics

Example: “Welding Operation → Joint Integrity → Visual and Dimensional Checks”


2. Identify Special Characteristics

During Step 5 of PFMEA (Risk Analysis), you identify critical (CC) or significant (SC) characteristics using risk ratings.

These characteristics must be reflected in the Control Plan with appropriate symbols, such as:

  • ◊ SC – Significant Characteristic
  • ● CC – Critical Characteristic

3. Transfer Controls from PFMEA to Control Plan

Controls for each cause/failure mode are categorized in PFMEA as:

  • Prevention Controls – transferred as process control methods
  • Detection Controls – transferred as monitoring/inspection methods

In the Control Plan:

From PFMEATo Control Plan
Prevention ControlProcess parameter control (e.g., torque value, temp)
Detection ControlInspection method (e.g., visual, gage, sensor)

4. Align with Recommended Actions

When PFMEA defines an action to mitigate risk, ensure:

  • That action is closed (status marked “implemented”), and
  • The corresponding control method is updated in the Control Plan

Example: If PFMEA recommends “Introduce error-proofing sensor”, the Control Plan must include “Sensor check – 100% inline” under detection method.


5. Maintain Traceability

Best practice is to cross-reference the PFMEA document number and revision in the Control Plan.

This ensures traceability and makes it easier during audits or when updating one document based on changes in the other.


AIAG-VDA Guidance on Linkage #

As per the AIAG-VDA FMEA Handbook, the Control Plan is considered a logical continuation of PFMEA. It should:

  • Be based on the same process step structure,
  • Use results from PFMEA risk prioritization,
  • Translate high-risk failure modes and causes into preventive and detective controls,
  • Include special characteristics with appropriate reaction plans.

Example: FMEA & Control Plan Linkage #

PFMEA Snippet

Process StepFunctionPotential Failure ModePotential CauseOcc.Prev. ControlDet. Control
Welding OperationJoin two partsWeak weld jointIncorrect current setting5Welding parameter checkVisual inspection

Corresponding Control Plan Entry

Process StepCharacteristicSpec/ToleranceControl MethodSample SizeReaction Plan
Welding OperationWeld Joint IntegrityVisual CheckVisual Inspection – 100%100%Stop production, rework
Welding Current200–250 AMonitor using PLCContinuousAdjust current, notify setter

Benefits of Linking FMEA and Control Plan #

  • ✅ Consistency: Ensures that risk evaluation and control implementation are aligned
  • ✅ Audit Readiness: Demonstrates thorough risk management process
  • ✅ Proactive Quality: Prevents failures before they reach the customer
  • ✅ Customer Satisfaction: Shows commitment to delivering high-quality, safe products
  • ✅ Compliance: Meets IATF 16949 and AIAG-VDA FMEA standard requirements

Best Practices #

  • 📝 Always update the Control Plan after any significant FMEA change
  • 🔄 Use software tools like APIS IQ-RM, PLATO SCIO, or Excel-based templates with linkage features
  • 🔍 Review during Layered Process Audits (LPA) to check effectiveness of controls
  • 📌 Use color codes or reference IDs to map FMEA rows to Control Plan rows easily
  • 👥 Train cross-functional teams on this linkage during APQP phases

Conclusion #

The link between FMEA and Control Plan is not just a documentation requirement—it’s the foundation of a robust quality management system.

By properly linking the risk analysis from FMEA to the actual control mechanisms in your manufacturing process, you ensure consistency, risk mitigation, and continuous improvement.

Start every Control Plan with your PFMEA by your side. Let your risk analysis guide your controls.


FAQs on FMEA and Control Plan Linkage #

Q1: Is it mandatory to link FMEA and Control Plan?

Yes. For IATF 16949 compliance and customer audits, a clear link between FMEA and Control Plan is required.

Q2: Can I create a Control Plan without PFMEA?

It’s not recommended. PFMEA identifies potential risks that the Control Plan must address.

Q3: How often should I update the Control Plan?

Whenever there is a change in process, product design, FMEA risk rating, or customer requirements.

Q4: Are special characteristics always required in the Control Plan?

Yes. Any SC or CC identified in the PFMEA must be reflected in the Control Plan with proper controls and reaction plans.


Internal Links Suggestions #

  • Control Plan | Complete Guide
  • Process FMEA | Step-by-Step Tutorial
  • AIAG-VDA FMEA 7-Step Approach
  • Special Characteristics in Automotive Industry
  • Layered Process Audits (LPA)
Updated on September 7, 2025

Are this content helpful..

  • Happy
  • Normal
  • Sad

Share This Article :

  • Facebook
  • X
  • LinkedIn
  • Pinterest
How FMEA Drives Control Plans in Manufacturing Quality
Table of Contents
  • What is FMEA?
  • What is a Control Plan?
  • Why Is the Linkage Important?
  • How FMEA and Control Plan Are Linked (Step-by-Step)
  • AIAG-VDA Guidance on Linkage
  • Example: FMEA & Control Plan Linkage
  • Benefits of Linking FMEA and Control Plan
  • Best Practices
  • Conclusion
  • FAQs on FMEA and Control Plan Linkage
  • Internal Links Suggestions
  • Free FMEA Course
  • Services
Contact Us
Contact Us
logo_color

One touch solution for FMEA documentation training or creation and support.

Learn

  • Knowledge base
  • Training
  • Newsletter

Company

  • About Us
  • Contact
  • Services
  • Products

Connect

© 2025 Quality Assist

Powered by Quality Assist